Changing supplier is very simple, it just involves signing the contract with the new provider with legal addresses the current provider and distributor area. The rest of the procedures performed by us.
By law the reading is done by each vendor’s current consumption areas. I mean the same that handle meter reading before.
No, the actual meter remains.
No, cables remain current.
Maintaining correct and authorized personnel with experience, it represents an increase in revenue from electricity production and reducing operating costs.
Reactive energy is serving as additional energy for the production and maintenance of magnetic fields and is consumed, in addition to active energy, receivers equipped with electrical coils, such as electric motors or transformers. Reactive energy has no effect.
– Installation of panels represents a decrease in cost of electricity consumed;
– By installing solar energy can become autonomous and avoid damage due to unscheduled interruptions of electrical networks;
– The contribution to protecting the environment by producing renewable energ
Under the law, fault rectification is the responsibility of the regional distributor. Ie the same as before. We take your complaint and submitted to a distributor. The deadline for resolving complaints legal.Conform remains the law, fault rectification is the responsibility of the regional distributor. Ie the same as before. We take your complaint and submitted to a distributor. The deadline for resolving the complaints remain legal.
The price of reactive power is regulated and is equal to the price approved for a power factor average realized in the range of settlement less than power factor neutral (power factor limit to which electricity consumption reactive not significantly influence losses and voltage regulation / reactive power into the grid, with a value of 0.92 for the regime established experimental inductive and capacitive mode 1) and greater than or equal to 0.65. For a power factor in the range of average realized settlement less than 0.65 is charged three times the regulated price approved by the competent authority.